results for "campus"
Results 61-62 of 62
Results Per Page: 
A project to upgrade Audio Visual (AV) technology in 30 classrooms in Tureaud Hall and 33 departmental classrooms throughout campus is complete as of August, 2023. The following AV technology will be included in each room. Podium PC : Each classroom will be equipped with a PC installed inside the podium (if equipped). Auto-tracking camera : The camera will be...
Article Id: 20539

General Information Available to: LSU Students, Faculty, Staff, Visitors who participate in eduroam, and Sponsored Guests. Available Wireless Networks that are broadcasted on the LSU Campus: eduroam ...
Article Id: 5252

Provide Search Feedback Logo
Search Google Logo